3.TRANSPORTATION OF CEMENT PLANTS’ EQUIPMENT

  • Transportation of Synchronous devices for the Thanh Liem Cement Plant

     The Waterway-roadway Transport Service Company was selected as a contractor in charge of transporting 5,730 tons of equipment, including 17 super-sized and super-weighted packages from Hai Phong port to the plant by road. In particular, there was a package of a cement crusher weighing 147,300kg, size (Ø4,600 x 17,820) mm. Transportation time is from 2008 – 2009

     Thanh Liem Cement Plant has the designed capacity of 1,500 tons clinker per day, located at Thanh Nghi commune, Thanh Liem district, Ha Nam province

  • Transportation of Synchronous devices of the Thanh Liem Cement Plant

     The Waterway-roadway Transport Service Company has successfully transported 3,728 tons of equipment, including 16 super-sized and super-weighted packages from Hai Phong port to Phu Tho Cement Plant safety and timely. Particularly, there was a package of cement grinding machine weighing 127.23tons with dimensions of (Ø4.280 x 16.700) mm. Transportation time is from 2008-2009

     Phu Tho Cement Plant with the designed capacity of 1,000 ton clinker per day, is located in Thanh Ba commune, Thanh Ba district, Phu Tho province, invested by the Phu Tho Cement JSC.

  • Transportation of Synchronous devices from Hai Phong port tothe Mai Son Cement Plantin Son La province by road and waterway

     The Waterway-roadway Transport Service Company has successfully transported all synchronous devices from Hai Phong port to the Mai Son Cement Plant in Son La province by roadway and waterway. The Mai Son Cement Plant has the designed capacity of 2,500 ton clinker per day, invested by the Mai Son Cement JSC and located in Na Bo commune, Mai Son district, Son La province

     Transportation time is from 2009 – 2010. The total freight volume is 7,698tons with 24 super-sized and super-weighted packages, including a package of cement grinding machine weighing 167.20tons with dimensions of (Ø4.852 x 19.8300) mm.

  • Successfully transported Synchronous devices of the Trung Son Cement Plantin Hoa Binh province

     Transco has successfully transported all synchronous devices of the Trung Son Cement Plant. It is a cement plant with the design capacity of 2,500 tons clinker per day, located at Trung Son commune, Luong Son district, Hoa Binh province, the employer of which is the Binh Minh Tourist Group JSC.

     Transportation time is from 2010-2011. The total freight volume is 7,028tons with 23 super-sized and super-weighted packages, including a package of cement grinding machine weighing 168.20 tons with dimensions of  (Ø4.820 x 20.380)mm

     All equipment of the project were delivered at Hai Phong port and Huu Nghi border gate (Lang Son province) then transported by road to the site of plant Hydropower Plant timely and safety.