TRANSPORTATION OF HYDROPOWER PLANTS’ EQUIPMENT

  1. Completed transportation of electromechanical equipment of the Cua Dat Hydropower Plant in Thanh Hoa province

The Waterway-roadway Transport Service Companywas selected as a contractor in charge of transporting the Cua DatHydropower Plant’s equipment. It is a hydropower plant with the design capacity of 104MW located at  Xuan My commune, Thuong Xuan district, Thanh Hoa province, the employer of which is Cua Dat Hydropower JSC.

All equipment of the project were delivered at Hai Phong port and Huu Nghi border gate (Lang Son province) then transported by road to the site of Cua Dat Hydropower Plant. The total freight volume is 3,680 tons with 32 super-sized and super-weighted packages of which two turbines weighing 65 tons/set; shipping size: (7.28 x 4.32 x 3.68) m. We has handed over the above mentioned cargo to the employer timely, ensuring the goods safety and progress.

  1. Completed transportation of electromechanical equipment of the Nam He Hydropower Plant in Dien Bien province

Recently, the Waterway-roadway Transport Service Companyhas successfully transported all imported electromechanical equipment from Hai Phong port to the Nam He HydropowerPlant. The total freight volume is 1,320 tons with 13 super-sized and super-weighted packages, including two turbines weighing 48 tons/set.

It is a hydropower plant with the design capacity of 36MW located at  Muong Tung commune, Muong Cha district, Dien Bien province, the employer of which is the Da River JSC No. 706.

  1. Completed transportation of electromechanical equipment of the Bai Thuong Hydropower Plant

The Waterway-roadway Transport Service Companywas selected as a contractor in charge of transporting the Bai ThuongHydropower Plant’simported electromechanical equipment. It is a hydropower plant with the design capacity of 12MW located at  Xuan Cam commune, Thuong Xuan district, Thanh Hoa province, the employer of which is the Bai Thuong Hydropower JSC.

The total transportation volume is 873 tons, transported by road from Hai Phong port to the site of Bai Thuong HydropowerPlant and timely handed over to the owner.

4.Completed transportation of electromechanical equipment of the Dong Van Hydropower Plant

The Waterway-roadway Transport Service Companywas selected as a contractor in charge of transporting the Dong VanHydropower Plant’simported electromechanical equipment. It is a hydropower plant with the design capacity of 34MW located at  Dong Van commune, Que Phong district, Nghe An province, the employer of which is the Dakrong Hydropower JSC.

The total transportation volume is 1,021 tons, transported by road from Hai Phong port to the site of Dong Van HydropowerPlant and timely handed over to the owner.