LIST OF CONSTRUCTION – PROJECTS COMPLETED

  • Hanoi Urban Railway project: Cat Linh – Ha Dong Line;
  • Project of Huong Linh 2 Wind Power Plant with the design capacity of 30MW located at Huong Linh commune, Huong Hoa district, Quang Tri province. Transported volume: 3,274 ton.
  • Project of Cua Dat Hydropower Plant with the design capacity of 104MW located at Xuan My commune, Thuong Xuan district, Thanh Hoa province. Transported volume: 3,680 ton
  • Project of Nam He Hydropower Plant with the design capacity of 36MW located at Muong Tung commune, Muong Cha district, Dien Bien province. Transported volume: 1,320 ton
  • Project of Bai Thuong Hydropower Plant with the design capacity of 12MW located at Xuan Cam commune, Thuong Xuan district, Thanh Hoa province. Transported volume: 873 ton
  • Project of Dong Van Hydropower Plant with the design capacity of 34MW located at Dong Van commune, Que Phong district, Nghe An province. Transported volume: 1,021 ton
  • Project of Thanh Liem Cement Plant with the design capacity of 1500 ton clinker per day located at Thanh Nghi commune, Thanh Liem district, Ha Nam province. Transported volume: 5,730 ton
  • Project of Phu Tho Cement Plant with the design capacity of 1000 ton clinker per day located at Thanh Ba commune, Thanh Ba district, Phu Tho province. Transported volume: 6,675 ton
  • Project of Trung Son Cement Plant with the design capacity of 2500 ton clinker per day located at Trung Son commune, Luong Son district, Hoa Binh province. Transported volume: 7,028 ton
  • The Mai Son Cement Plant with the design capacity of 2,500 ton clinker per day located at  Na Bo commune, Mai Son district, Son La province. The total freight volume is 6,998 ton

 